| Sl. No. Name of Project | Demand Ulilisation (TMC) |
Protected Demand (TMC) |
Balance (TMC) |
Demand out of Balance 75 Per- cent Dependable Flows (TMC) |
||||
| 22. Bennithora Project | 6.01 | - | 6.01 | 6.00 | ||||
| 23. Gandhorinala Project | 3.46 | - | 3.46 | 2.20 | ||||
| 24. Uppcr Millamari Project | 1.30 | - | 1.30 | 1.30 | ||||
| 25. Lower Millamari Project | 4.38 | - | 4.38 | 4.40 | ||||
| 26. Kagna Project | 12.93 | - | 12.93 | 2.00 | ||||
| 27. Minor Irrigation (K-6) | 30.77 | 6.47 | 24.30 | 11.40 | ||||
| 28. Minor Irrigation (K-7) | 2.88 | 0.69 | 2.19 | 1.66 | ||||
| 29. Tungabhadra Project (Left | ||||||||
| Bank Canal Right Bank Low | ||||||||
| Level Canal. Right Bank High | ||||||||
| Level Canal) | 147.50 | 132.00 | 15.50 | 9.30 | ||||
| 30. Vijayanagar Channels | 13.70 | 5.71 | 7.99 | 8.00 | ||||
| 31. Rajolibunda Diversion | 1.20 | 1.20 | - | - | ||||
| 32. Tunga Anicut | 11. 50 | 11.50 | - | - | ||||
| 33. Bhadra Project | 62.00 | 61.70 | - | - | ||||
| 34. Bhadra Anicul | 3.10 | 3.10 | - | - | ||||
| 35. Condi Left Bank | ||||||||
| Canal, Extension | 2.00 | - | 2.00 | 2.00 | ||||
| 36, Ambligola | 1.40 | 1,40 | - | - | ||||
| 37, Anjanapur | 2.50 | 2.50 | - | - | ||||
| 38. Dharma Project and Canals | 2.20 | 2.20 | - | - | ||||
| 39. Hagaribommanahalli | 2.00 | 2.10 | - | - | ||||
| 40.. Upper Tungabhadra | 19.00 | - | 19.00 | - | ||||
| 41. Tungabhadra Foreshore Lift | 11.85 | - | 11.85 | - | ||||
| 42. Tungabhadra Diversion | 20.00 | - | 20.00 | - | ||||
| 43. Upper Tunga Project | 41.00 | - | 40.0 | 20.00 | ||||
| 44. Upper Bhadra Project | 36.11 | - | .36.00 | 10.00 | ||||
| 45. Madagmasur | 2.71 | - | 2.71 | - | ||||
| 46. Dandavathy | 2.60 | - | 2.60 | - | ||||
| 47. Varada | 7,00 | - | 7.00 | - | ||||
| 48.. Hirehalla | 1.06 | - - | 1.06 | - | ||||
| 49, Minor Irrigation (K-8) | 100.92 | 49,04 | 51.88 | 23,59 | ||||
| 50, Vanivilas Sagar | 8,20 | 8,20 | - | - | ||||
| 51. Feeder Channel to Ranikere | 1.05 | - | 1.05 | 1.00 | ||||
| 52. Jinigehalla | 0.32 | - | 0.32 | 1.00 | ||||
| 53. Minor Irngation (K-9) | 38.20 | 29.87 | 8.33 | 4.25 | ||||
| Total | 1432.41) | 504.55 | 926.87 | .367.00 | ||||
Table 8.4 Demands of Maharashtra
State
| St.. No. Name of Project | Demand (TMC) |
Protected Utilisation (TMC) |
Balance Demand (TMC) |
Demand out of Balance 75 Per cent Dependable Flows(TMC') |
| 1.Krishna Project | 35.9 | 36.3 | (0.6) | |
| (1.0) | (1.0) | |||
| 2. Urmodi Project | 6.2 | - | 6.2 | 6.2 |
| 3. Tarali Project | 6.7 | - | 6.7 | 6.7 |
| 4. Canal ex-Khodshi Weir | 5.7 | 2.7 | 3.0 | 3.0 |
| (2.5) | (2.5) | |||
| 5. Koyna hydel and Koyna | ||||
| Krishna Lift Scheme with Varunji Weir | 129.4 | 74.8 | 54.6 | 54.6 |
| 6: Wang Project | 12.1 | - | 12.1 | 12.1 |
| 7. Warna Project | 57.4 | 47.7 | 9.7 | 9.7 |
| 8. Radhanagarj Project | 11.0 | 11.0 | -- | - |
| 9. Kadvi Irrigation Project | 15.6 | - | 15.6 | 8.0 |
| 1(1. Kasari Irrigation including Kaljewadi | 42.4 | - | 42.4 | 12.0 |
| 11. Kumhhi Irrigation | 17.5 | - | 17.5 | 10.0 |
| 12. Phonda Irrigation Project | 4.2 | - | 4.2 | 3.0 |
| 13. Vedganya Irrigation Project | 27.7 | - | 27.7 | 10.0 |
| 14. Tulshi Project | 3.5 | 2.6 | 0.9 | - |
| 15. Dudhganga project | ||||
| (Maharashtra Prtion) | 26.0 | -- | 26.1) | 18.0 |
| 16. Morna Project | 1.6 | -- | 1.6 | 1.6 |
| 17. Phaya project | 1.4 | - | 1.4 | 1.4 |
| 18. Minor Irrigatior'(K-) | ||||
| (utilising less than 1 | ||||
| TMC annually) | 42.3 | 11.1 | 31.2 | 26.2 |
| 19. Minor Irrigation (K-2) | ||||
| (utilising less than 1 | ||||
| TMC annually) | 2.0 | 0.1 | 1.9 | 1.3 |
| 20 Hiranyakeshi Irrigation Project | 32.2 | - | 32.2 | 12.() |
| 21. Gudavale Lift scheme | 3.1 | -- | 3.1 | 3.1 |
| .22. Minor Irrigation (utilising less than 1 TMC annually) | 1.9 | 1.0 | 0.9 | 0.9 |
| 23. Tala Hydel Works | 45.0 | 45.1 | ||
| 24. Mutha Syslem ex-Khadakwasla | 13.1 | 23.5 | 9.6 | 9.6 |
| (1.1) | (1.1) | |||
| 25. Kukadi Project | 38.9 | 20.1 | 18.8 | 18.8 |
| (2.0) | (2.0) | |||
| 26. Ghod Dam Project | 10.4 | 10.4 | ||
| 27. Chaskaman Project | (10.0) | _ | (10.0) | _ |
Table 8.4 Condt.
| St.. No. Name of Project | Demand (TMC) |
Protected Utilisation (TMC) |
Balance Demand (TMC) |
Demand out of Balance 75 Per cent Dependable Flows(TMC') |
|
| 28. Kundali Project | (2.5) | - | (2.5) | - | |
| 29. Bhima Irrigation Project | 90.7 | 90.2 | 0.5 | ||
| 30. Nira System ex-Vir | 65.2 | 34.6 | 15.9 | 15.9 | |
| 14.7 | |||||
| 31. Barhanpur Project | 1.5 | - | 1.5 | 1.5 | |
| 32. Mhaswad Project | 2.2 | 2.2 | - | - | |
| 33. Ashti Project | 1.0 | 0.7 | 0.3 | - | |
| 34. Begumour Lift Scheme | 5.3 | - | 5.3 | 5.3 | |
| (10.1) | (10.1) | ||||
| 35. Sina at Nimgaon | 1.8 | - | 1.8 | 1.8 | |
| 36. Mangi Project | 1.2 | 1.1 | 0.1 | ||
| 37. Sina at Kolagaon Project | 4.3 | - | 4.3 | 4.3 | |
| 38. Ekruk Tank Project | 2.0 | 1.8 | 0.2 | ||
| 39. Khasapur Project | 1.3 | 1.3 | - | - | |
| 40. Hingni Pangaon Project | 1.6 | - | 1.6 | 1.6 | |
| 41. Sina Lift Scheme | 3 0 | - | 3.0 | 3.0 | |
| (3 0) | (3 0) | ||||
| 42. Sholapur City Water Supply | 1.6 | 0.3 | 1.3 | - | |
| 43. Minor Irrigation (K-5) | |||||
| (ulilising less than I | |||||
| TMC annually) | 28.5 | 4.8 | 23.7 | 16.4 | |
| 44. Kumoor Project | 1.9 | 1.5 | 0.4. | - | |
| 45. Minor Irrigation (K-6) | |||||
| (ulilising less than I | |||||
| TMC annually) | 2.5 | 0.1 | 2.4 | 2.4 | |
| Total | 828.8 | 439.6 | 389.6 | 280.4 | |
| (32.2) | (31.8) | ||||